Displayed and numbered in accordance with the Rules Publication Act 1953.
Notified in the Gazette on 29 January 2003
This order is administered in the Department of Infrastructure, Energy and Resources.
EXPLANATORY NOTE
(This note is not part of the order)
This order declares a planning corridor for either side of the gas pipeline extending from (a) the low-water mark at Five Mile Bluff to the Bell Bay Power Station via the Bell Bay Natural Gas Pressure Reduction Station; and(b) the Bell Bay Natural Gas Pressure Reduction Station to a point adjacent to the property occupied by Ecka Granules Australia Pty Ltd; and(c) the Bell Bay Natural Gas Pressure Reduction Station to the Rosevale/Westwood Natural Gas Pressure Reduction Station; and(d) the Rosevale/Westwood Natural Gas Pressure Reduction Station to the Bridgewater Natural Gas Pressure Reduction Station; and(e) the Rosevale off-take station to the Gawler main-line valve; and(f) the Gawler main-line valve and launcher station to the Australian Bulk Minerals plant via the Port Latta main-line valve and receiver station.